2. Click the Tasks with a deadline link located in the Tasks Assigned To You section on the PAMS homepage (Figure 1).
Figure 1. PAMS Homepage – Tasks with a deadline
...
Element | Description |
A. Senior/Key Person | List all senior/key personnel. This includes the PI and any Co-PIs. (Figure 5) |
B. Other Personnel | List all other non-essential personnel. (Figure 6) Non-essential personnel includes: · Post-Doctoral Associates · Graduate Students · Undergraduate Students · Secretarial/Clerical · Engineers · Technicians · Other (up to 4) |
C. Equipment Description | List all project equipment. (Figure 7) |
D. Travel | List all travel costs (Figure 8). Travel costs include: · Domestic Travel Costs · Foreign Travel Costs |
E. Participant/Trainee Support Costs | List all participant and trainee support costs for the duration of the project (Figure 9). Participant/Trainee Support Costs include: · Tuition/Fees/Health Insurance · Stipends · Travel · Subsistence · Other |
F. Other Direct Costs | List all other direct costs to the project (Figure 10). Direct Costs include: · Materials and Supplies · Publication Costs · Consultant Services · ADP/Computer Services · Subawards/Consortium/Contractual Costs · Equipment or Facility Rental/User Fees · Alterations and Renovations · Other (up to 3) |
G. Direct Costs | This section will automatically populate based on the entries made in the previous sections. (Figure 11) |
H. Indirect Costs | List all indirect costs to the project (overhead, G&A, etc.). (Figure 12) |
I. Total Direct and Indirect Costs | This section will automatically populate based on the totals of the Direct Costs and Indirect Costs sections. (Figure 13) |
J. Fee | Fee is a % of the total cost of the project. (Figure 14) |
K. Cost of Project | This section will automatically populate based on the totals calculated from the previous sections. (Figure 15) |
If the Proposal was submitted with a Total Fed/Non-Fed Budget form, sections A-K will display the following additional columns to clarify the breakout of Federal versus Non-Federal amounts in the budget:
|
Figure 5. Complete Revised Budget – Budget – Senior/Key Person
...
Figure 9. Complete Revised Budget – Budget – Participant/Trainee Support Costs
Figure 10. Complete Revised Budget – Budget – Other Direct Costs
...
2. To add a project/subaward, click the Add Project/Subaward link on the left above the grid (Figure 18).
Figure 18. Complete Revised Budget – Subawards
...